Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole - Prece

 MODENA  -  Itālija
Verified company
 Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
  •  Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
Application: Telecom
Technology: Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
Material: FR4 High TG with filler + Rogers RO4350. Via Filled and capped, back drilled hole
Finishing: Enig

Prece Apraksts

Application: Telecom
Technology: Multilayer 8 layer mixed layup Via Filled and capped, back drilled hole
Material: FR4 High TG with filler + Rogers RO4350. Via Filled and capped, back drilled hole
Finishing: Enig

Cena Prece

Cena nav uzrādīta

I want to get more details about the product

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
* Obligāti aizpildāmi lauki